construction of stands

In the current post we continue with the exhibition of the phases of design and construction of stands. Continuing with the phases of construction, assembly and erection. Showing at the same time the characteristics of our professional service and adapted to the needs of each client.

Phase 3: Production

Once we have made the design of the stand, approved by the client, and with the plans created. We move on to the production phase of the stand with the materials, shapes, works… agreed by the client and following the design made. These plans will be used to send the necessary suppliers to create the client’s personalised stand.

This phase takes place in our facilities in Barcelona. Our professionals in the production and construction of stands will carry out all the necessary elements for the stand. From carpentry, to lighting, metalwork, flooring… In all types of materials. At the end of the stand construction phase, with all the elements and details controlled. It will be time to move on to the transport of the stand.

Phase 4: stand transport

At our headquarters in Barcelona and with our own fleet of trucks, we will transport the various parts of the stand to their location and presentation. By having our own fleet of trucks we will be able to carry out this phase with the greatest possible professionalism. Furthermore, their availability at all times allows us to overcome any inconvenience that may arise.

Phase 5: Assembly and assembly of the stand

When the parts of the stand arrive at the place of presentation and placement. Our professionals will carry out the assembly and final assembly of the same. It is a delicate phase, in which professionals like those we have in our company are needed. This final work must have the highest quality standards to achieve the personalised stand that the client wants.

Our professionals will carry out this phase by finishing the assembly of the stand and delivering it to our clients. At this point, the fair, show or congress will begin. But our work will not be finished. The final phase will remain.

Phase 6: Dismantling, reuse and recycling of the stand

At the end of the event it will be time to develop our final work. We will carry out the dismantling of the stand. Reusing as many materials as possible in subsequent stands. To avoid wasting the maximum possible material, being aware that the sector of ephemeral events spends a lot of materials that we must reuse to avoid spending the maximum possible material. Finally, we will recycle in the appropriate way the materials that cannot be reused in subsequent stands.

In the last two posts we have developed a guide of the basic phases of design and construction of stands for events. At the same time we have shown the characteristics of our work during the different phases. If you are looking for a supplier of stands for your events, do not hesitate to contact us, we will inform you without obligation.

We offer custom exhibition stand build in Germany, France, Italy, Spain, UK and all Europe. These locations ensure that the build up to all major exhibition cities are within a day’s reach.
Professional exhibition stand builders must be quick, flexible, creative and detail-oriented. An effective stand after all.
Angle exhibit with an overall stand design and build expertise of more than 30 years.

Web design developed by PosicionandoT.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.